电网企业将LCC理论应用作为提高设备资产效率和质量的有效手段,亟需解决LCC应用中的模型计算和评价体系问题。本文通过构建电网企业资产全寿命周期管理机制,建立了电力设备的LCC的计算模型和方法,采用基于模糊数学中的模糊隶属度方法,改进了技改和大修项目分摊到多个设备资产分摊方法,提出了电力设备的LCC评价模型和评价体系,并成功应用于中国南方电网广州地区的设备和项目管理中,达到了设备资产的运营质量和效率优化决策目标。

Life-cycle cost model and evaluation system for power grid assets based on fuzzy membership degree

基于模糊隶属度的电力设备资产全寿命周期成本模型及评价体系研究

Guilin Zou1, Yan Huang1, Wen Chen1, Liangzheng Wu1, Shangyong Wen2

(1.Energy Development Research Institute, China Southern Power Grid, Guangzhou 510623, P.R. China 2.Electric Power Project Cost Administration, China Southern Power Grid Co., Ltd., Guangzhou 510623, P.R. China)

一分钟语音讲解

Abstract

Life-cycle cost (LCC) theory can be effectively applied to improve the efficiency and quality of power plant equipment and asset management. However, specific aspects of the LCC calculation and evaluation model require further research for practical application. This paper proposes an LCC assessment model for the management of electric power plant equipment during its service life. A membership function method based on fuzzy logic is used to improve the allocation of modernization and overhaul projects to multiple equipment assets. An LCC assessment model and evaluation system for power equipment are proposed and successfully applied to the equipment and project management of a Guangzhou power plant in the China Southern Power Grid, providing a decision-making mechanism that facilitates efficient operation and optimal utilization of power plant equipment and assets.

Keywords

Asset LCC, Power equipment management, Fuzzy evaluation, Membership degree, Asset allocation.

图片

Fig.1 LCC allocation flowchart for operation and maintenance projects

图片

Fig.2 LLC allocation flowchart for modernization and overhaul projects

图片

Fig.3 Standard cost rate curve for similar assets

图片

Fig.4 Standard cost ratio curve for specific type of assets

本文引文信息

Zou G, Huang Y, Chen W, Wu L, Wen S (2021) Life-cycle cost model and evaluation system for power grid assets based on fuzzy membership degree. Global Energy Interconnection, 4(4): 434-440

邹贵林,黄琰,陈雯,吴良峥,文上勇 (2021) 基于模糊隶属度的电力设备资产全寿命周期成本模型及评价体系研究. 全球能源互联网(英文), 4(4): 434-440

Biographies

图片

Guilin Zou

Guilin Zou received a bachelor’s degree from Shanghai Jiao Tong University, Shanghai, in 1995. He is working at the Energy Development Research Institute, China Southern Power Grid, Guangzhou 510623, China. His research interests include life- cycle cost control of power grid construction projects, whole process management of

power grid construction, life-cycle quota standards for power grid infrastructure projects, and international project cost standards.

图片

Yan Huang

Yan Huang received a master’s degree from North China Electric Power University, Beijing, in 2002, and a master’s degree from North China Electric Power University, Beijing, in 2005. She is working at the Energy Development Research Institute, China Southern Power Grid, Guangzhou 510623, China. Her research interests include economic engineering and project management.

图片

Wen Chen

Wen Chen received a master’s degree from Nanjing University, Nanjing, in 2010, and a master’s degree from Nanjing University, Nanjing, in 2013. She is working at the Energy Development Research Institute, China Southern Power Grid, Guangzhou 510623, China. Her research interests include item pro- phase evaluation, post-project evaluation, and project management.

图片

Liangzheng Wu

Liangzheng Wu received a master’s degree from the Changchun Institute of Technology, Changchun, in 2004, and a master’s degree from Jilin University, Changchun, in 2007. He is working at the Energy Development Research Institute, China Southern Power Grid, Guangzhou 510623, China. His research interests include item pro-phase evaluation, post-project evaluation, and project management.

图片

Shangyong Wen

Shangyong Wen received a master’s degree from Wuhan University, Wuhan, in 1998, and a master’s degree from Wuhan University, Wuhan, in 2001. He is working at the Power Construction Quota Station, China Southern Power Grid Company Limited, Guangzhou 510623, China. His research interests include technological economics and project management.