logoGlobal Energy Interconnection

Contents

Figure(0

    Tables(0

      Global Energy Interconnection

      Volume 3, Issue 3, Jun 2020, Pages 217-226
      Ref.

      Evaluation of optimal UPFC allocation for improving transmission capacity

      Xuhui Shen1 ,Hongmei Luo1 ,Wenman Gao1 ,Yuyao Feng2 ,Nan Feng2
      ( 1.China Electric Power Research Institute,Haidian District,Beijing 100192,P.R.China , 2.State Grid Shanghai Municipal Electric Power Company,Yangpu District,Shanghai 200437,P.R.China )

      Abstract

      A unified power flow controller (UPFC) combines the advantages of various flexible alternating current transmission system (FACTS) devices into a powerful format.Using a 500 kV power grid,this study evaluates the selection and use of a UPFC to improve transmission capacity.The “UPFC unit capacity control proportionality coefficient” is introduced to quantify the control effect of the UPFC,and an optimal calculation method for the UPFC capacity is presented.Following the proposal of a UPFC site selection process,the data of an existing power grid is used to conduct simulations.The simulation results show that the UPFC has a strong ability to improve transmission capacity,and its use is greatly advantageous.Additionally,by applying the proposed selection method,the control effect and economic benefits of the UPFC can be comprehensively considered during project site selection.These findings have a guiding significance for UPFC site selection in ultra-high voltage power grids.

      1 Introduction

      As the power load increases,the insufficiency between the demand to improve power flow distribution and the availability of construction land for power sources has become more prominent.In order to maximize the power grid supply capacity,various unified power flow controller (UPFC) projects have been built and put into operation in China [1].UPFC is an advanced flexible alternating current transmission system (FACTS) device,which represents the commanding point of FACTS technology [2].The operation of UPFC project plays an exemplary role in solving the problems of power grid construction [3].

      There are not only very few academic studies on UPFC engineering application schemes,but also no unified standard for UPFC control effect evaluation.In previous research,the problem of UPFC location and capacity was divided into two methods: the optimal flow method [4–6]and the sensitivity analysis method [7–9].However,the actual network topology is complex and will lead to tedious and blind calculations [10].Therefore,this study evaluates the selection and application of a UPFC in a 500 kV power grid,mainly for the purpose of improving transmission capacity limitations caused by uneven power flow distribution.

      The paper is structured as follows.First,the UPFC’s working principle and model is introduced.Thereafter,through the analysis of the ultra-high voltage (UHV) power grid’s current operating status and typical UPFC application scenarios,this paper presents the concept of the “UPFC unit capacity control proportionality coefficient,” so as to realize the quantitative evaluation of UPFC application effect.Based on this coefficient,this paper studies the problem of UPFC locating and sizing,and proposes a UPFC selection process at the technical level.Finally,an existing provincial power grid is simulated an example,and the results thereof analyzed.

      2 UPFC operating principle

      2.1 Positioning of UPFC in FACTS technology

      Almost all FACTS elements are based on the controlled switching of power electronic devices to realize power flow control,voltage regulation,enhancement of transient stability,and mitigation of low-frequency system oscillations effectively [11].

      Table1 shows the qualitative comparison results of FACTS devices such as static VAR compensators (SVC),static synchronous compensators (STATCOM),thyristor-controlled series compensations (TCSC),thyristor controlled phase shifting transformers (TCPST),and UPFCs in improving the static voltage stability,transient stability,and power transmission capacity of the system (● indicates that the effect is average,●● indicates that the effect is above average,and ●●● indicates that the effect is very good) [12].It can be seen that the UPFC has strong capabilities in all the functions.UPFC projects not only have significant safety,economic,and social benefits,but also important demonstrative significance.

      Table1 Comprehensive effects comparison of common FACTS devices

      device name static voltage stability power transmission capacity transient stability SVC ●●● ● ●STATCOM ●●● ● ●●TCSC ● ●●● ●●●TCPST ● ●● ●●●UPFC ●●● ●●● ●●●

      2.2 UPFC basic structure

      A UPFC is a new power flow control device composed of a parallel STATCOM and a series (static synchronous series compensator) SSSC.Its model and the structure diagram are shown in Fig.1 [13],where U̇1 and U̇2 are node voltages at both ends of the line where the UPFC is located,and the phase angle difference between them is θ.

      Fig.1 UPFC model and the structure diagram (reprinted from [13])

      The series part of a UPFC can be equivalent to a voltage source,which is represented by BU.The amplitude is represented by UB,and phase angle by ρ.The controllable range of UBis [0,UBmax]and that of ρ is [0,2π].

      If U1 is taken as the reference vector and the line’s capacitance and resistance are ignored,the line power without the UPFC is

      When the UPFC is installed in the line,the voltage at the sending end becomes At this time,the line power is

      The model of the parallel part of the UPFC is a current source (represented by ).With as the reference vector, can be decomposed into active current and reactive current

      When Ihp>0,the parallel side injects active power into the system.When Ihp<0,the parallel side absorbs active power from the system.When Ihq>0,the parallel side injects capacitive reactive power into the system.When Ihq<0,the parallel side injects inductive reactive power into the system.

      By controlling the UPFC can realize the power exchange between the parallel side and the system,so as to adjust the bus voltage,control the reactive power compensation,and balance the active power of the DC capacitor [14].

      2.3 UPFC calculation model

      In this paper,the UPFC modular power injection model in the PSD-BPA power system analysis software package is adopted [15].The series terminal is equivalent to an injection power of the node,so we can set the power flow target directly.At the same time,the reactive power control or the fixed node voltage control can be carried out at the parallel end.The control parameter matrix C is shown below:

      where the first line represents the series part control model and P' and Q'express the power flow target.Lines two and three represent the parallel part control model; QSNTexpresses the reactive power control target,and USNTis the fixed node voltage.

      In a scenario where the UPFC is used to solve a line overload problem and improve transmission capacity,only P' and Q' are set in the calculation,QSNTor USNTare not set.In this way,the current can be transferred to other lines in the section [16].

      3 Demand analysis of 500 kV power grid

      3.1 Power grid’s current situation and existing problems

      Until the establishment of an extra-high voltage backbone grid,500 kV lines will still exist as part of the provincial grid skeleton and trans-provincial transmission channels,and continue to play an important role in power exchange within and between provinces.

      In the operation of the main grid,the following problems are often encountered:

      (1) Existence of high and low voltage electromagnetic ring network and complex ring network.

      (2) Limited transmission capacity and grid instability.

      (3) Control problem of reactive power balance.

      China’s energy resources are unevenly distributed.Energy resources and electricity demand are inversely distributed,which leads to limited transmission capacity.Owing to thermal,transient,and dynamic stability problems,approximately 1/4 of the transmission lines capacity is limited.This affects mainly cross-regional communication lines and heavy load sections in the regional grid [17].

      3.2 Application of UPFC in 500 kV power grid

      In some areas,the power grid structure is relatively fixed,and problems such as power flow and reactive voltage exist for a long time.UPFCs can be used to improve system performance when the conventional scheme is difficult to solve or the cost is high.Typical application scenarios include:

      (1) The grid’s power flow is complicated and the power flow distribution needs to be optimized.

      (2) The power flow distribution of the transmission section is uneven,and the section transmission capacity needs to be improved.

      (3) The long-distance large-capacity AC transmission has dynamic stability problems,so the system damping needs to be improved.

      (4) There is a voltage stability problem in the power grid.

      For the application scenarios where the section transmission capacity is limited by the uneven power flow distribution,attention should be paid to the effect of UPFC on power flow control [18].For the application scenarios where the power grid’s reactive power support capability should be improved,attention should be paid to the effect of the UPFC on reactive power support capacity.In practical engineering applications,it is advisable to carry out calculations of power flow,reactive voltage,system stability,and short-circuit current in order to determine the UPFC operation control mode after it is connected to the system [19].

      Judging from the problems faced by UHV grids,the urgency of grid demand,and comprehensive utilization benefits,the promotion and application of UPFC should first consider scenarios where the section transmission capacity is limited.In this scenario,the UPFC can maximize its power flow control ability,and result in considerable utilization benefits.

      4 Optimal UPFC allocation method for 500 kV power grid

      A UPFC’s power flow control ability can be used to transfer the power flow from a section’s heavy-load line to the its light-load lines,so as to reduce the overloaded line’s power flow.The installation location and capacity calculation of the UPFC will determine its power flow control effect.

      4.1 Quantitative evaluation method of UPFC control effect

      Based on the analysis results in Section 3,this section conducts a detailed study on the evaluation indexes of UPFC power flow control.

      In this study,the “UPFC unit capacity control proportionality coefficient” (KUPFC) is put forward to achieve quantitative evaluation of the UPFC power flow control effect.KUPFCis the ratio of the lifting capacity of the section transportation to the installed UPFC capacity,as shown in (6).The larger the value of KUPFC,the better the control effect of the UPFC unit capacity.

      where SUPFCis the capacity of the UPFC installed,ΔPUPFCrepresents the power flow control effect of the UPFC (namely section lifting power),Pup is the section transport power with UPFC installed,and P0 is the original transport power.

      SUPFCis directly related to economic costs.When the equipment capacity is larger,the initial costs IC and the later maintenance costs OC are higher [20],as shown in equations (7) and (8):

      Among them,CUPFC is the unit cost of UPFC,the unit is yuan/MVA.CYX and CJX is the operating cost and maintenance cost of the unit capacity UPFC,and the value is related to the operating environment of the specific equipment,and the unit is yuan/(MVA·year).K stands for years of operation.

      ΔPUPFCis directly related to the reliability benefit.The increase of transmission power can improve the reliability of the power supply and reduce the cost of user power outages [20].

      It can be seen that KUPFC can be used to comprehensively evaluate the installation effect of UPFCs from the perspectives of economy and improved system stability.

      4.2 Optimization method of UPFC installation position and capacity

      The essence of using UPFC to improve power flow’s distribution and solve the problem of line’s overload is to use UPFC’s power flow control ability to transfer the power flow from the heavy load line to the section’s light load lines,so as to reduce the overload line’s power flow.The installation location and capacity calculation of UPFC will determine UPFC’s power flow control effect.In this part of study,to ensure a single variable,UPFC is installed at the head of line,that is,the power flow sending end in default.

      4.2.1 UPFC site selection method

      To fully develop the UPFC control performance and maximize the overall benefit of a UPFC project,this paper puts forward the following general configuration principles based on existing engineering experiences [21–26]:

      (1) Prioritize trans-provincial connection sections.

      (2) Prioritize transmission cross-sections in provinces.

      Adding UPFCs on these kinds of cross-sections can play a role in balancing the power flow,thereby improving the power exchange capacity of the cross-section and the power dissipation capacity of the DC converter station near the area power grid.

      On the basis of the above general configuration principles,it is necessary to carry out in-depth N-1 and N-2 fault checks on the lines to find out the weak links of important sections in the power grid.This analysis is useful in finding alternative locations for UPFC installations [27].

      4.2.2 Determination of UPFC installation line

      Following the determination of the demand point of the UPFC,the specific installation line is selected according to the section’s compensation demand.

      The typical setup of an inductive compensation demand system is shown in Fig.2(a).Most of the lines in this section show light-load,and only one line is heavy-load.In this case the UPFC should be installed on the heavy-load line to transfer the load flow to the adjacent light-load lines.

      The typical setup of a capacitive compensation demand system is shown in Fig.2(b).Most of the lines in this section show heavy-load,and only one line is lightly loaded.In this case the UPFC should be installed on the light-load line to transfer the heavy-load line’s load flow to this lightly loaded line.

      Fig.2 Schematic diagram of power flow control demand with UPFC device (thick line indicates heavy power flow,thin line indicates light power flow)

      When the number of heavy-load lines and light-load lines in the section is the same,it is usually best to compare the two schemes of limiting power flow in the heavy-load lines or raising power flow in the light-load lines.Thereafter it can be determined whether to install the UPFCs in the heavy-load or light-load lines.

      When attempting to solve the problem of transmission line overload,priority should be given to install the UPFC directly on the overload line.The capacity requirement of installing the UPFC directly on the overload line is smaller than that of the other lines in the section [28].

      4.2.3 UPFC optimal capacity calculation

      When aiming to improve the cross-section transmission capacity,the UPFC’s parallel side capacity (denoted by SUPFCp) is usually taken as a series side capacity (denoted by SUPFCs),socan be expressed as follows [29–31]:

      where Iis the rated current of the UPFC’s series side,which can be selected according to the rated current of the line where it is located.

      The cross-section’s transmission capacity is limited by the N-1 static power flow constraint,i.e.,the failure of one circuit in the section causes the overload of another circuit.The faulty line is called LEF,the overloaded line is called LEO,and the remaining lines are denoted by LEi (the total number of branches is mE, Since LEO’s active power exceeds the limit after N-1 faults of LEF,the UPFC is installed in LEF to improve the section current and enhance the transmission capacity.

      LEO’s active power is controlled to the rated power (denoted by PEOmax),and the UPFC’s reactive power control target is set according to the line’s power factor μEO,as shown in (10).On the premise that the line parameters and the initial state of the power grid are known,according to (3) and (4),the equivalent voltage value and phase angle at LEO’s transmission end can be obtained,so as to obtain the equivalent voltage source model of the UPFC at this time,namely UB and ρ.

      According to Fig.1,the numerical size of UBis determined by the D-value between P0 and P'(that is The larger the D-value,the larger the value of SUPFC.At the same time,if the difference between P0 and P' increases,then ΔPUPFCincreases,indicating that the lifting effect becomes stronger [32].This can be expressed by the following formulas:

      The UPFC device achieves control of the line power target by changing the serial voltage (UB).From a UPFC performance viewpoint,the higher UB,the stronger the regulation of the flow.However,excessive UBwill significantly increase SUPFC and technical difficulty.Therefore,the upper limit of UB needs to be determined according to the economy of the UPFC device.At the same time,too small a UB cannot effectively regulate the line power flow function.Therefore,it is necessary to determine the lower limit of UB according to the section capacity improvement demand.

      According to [33],with the increase of the section’s target transport capacity,ΔPUPFC remains the same,and the required increase in the converter output increases,which means ΔPUPFC/SUPFC becomes smaller and the UPFC’s efficiency decreases.In this capacity range,there is a saturation relationship between the UPFC capacity and the section boost transfer ability.

      Substituting SUPFC into (13) allows for comprehensive consideration of both the technical difficulty and economy of UPFC installation.

      4.3 Optimized configuration of UPFC selection process

      Fig.3 shows the UPFC site selection flowchart for a 500 kV grid.By comparing the control effect of each installation position horizontally,this method can quickly realize the optimal installation position of the UPFC.

      In this process,UPFC site selection and optimal capacity calculation are divided into the following steps:

      (1) Based on grid data,power grid operational analysis is carried out.Inter-provincial and intra-provincial crosssections where the N-1 safety check failed are selected.

      (2) The UPFC installation line is chosen according to the demand characteristics of the section.

      (3) If there is a margin to increase the cross-sectional capacity,SUPFC should be calculated when KUPFC is maximized.

      5 Simulation analysis of UPFC application scheme

      This section uses a 500 kV grid in a province in China as the research object to analyze the effect of a UPFC installation on the power grid.This section carries out the economic analysis of the optimized UPFC scheme.The calculation uses 2020 planning data from provincial operation planning report.

      Fig.3 Flow chart of UPFC installation site selection

      5.1 UPFC installation location analysis

      Based on the results of line N-1/N-2 checks and UPFC site selection principles,three UPFC demand sites were obtained in this power grid.The three sections are all important provincial sections,namely,the Northern-Central section,Central-South section,and Western delivery section.

      (1) Northern-Central section

      North-Central section is composed of four circuits.The section has the same number of heavy-load lines as lightload lines.

      The installation line of the UPFC was chosen following determination of which option is more economical between installing on light-load or heavy-load lines.

      After verification,it was found that the section transmission power could be increased by approximately 1000 MW by addition of the UPFC.Fig.4 compares the required UPFC capacities for light-load and heavy-load lines at different section lifting powers.

      Fig.4 Comparison of UPFC capacities required for the light-load and heavy-load lines of the Northern-Central section (the red dots represent that UPFC is installed on the light-load line side,the blue dots represent that UPFC is installed on the heavy-load side.)

      With the increase of section lifting power,the differences between the line current carrying capacities decrease,and the differences between UPFC capacities also decrease.However,the economic effect of installing the UPFC in heavy-load lines is better than that of installing it in light-load lines.Therefore,the UPFC is selected for the head of heavy-load double circuit lines.

      (2) Central-South section

      Central-South section is composed of six circuit lines,with more light-load lines than heavy-load lines.It is a typical case of inductive compensation demand.The UPFC is selected for the head of heavy-load single circuit line.

      (3) Western delivery section

      This section is composed of five circuit lines,with more light-load lines than heavy-load lines.It is a typical case of inductive compensation demand.The UPFC is selected for the head of heavy-load double circuit lines.

      5.2 UPFC optimal capacity calculation

      Following determination of the UPFC installation line,the UPFC is distributed into the data model.This example uses 50 MW as the gradient for calculation.In each calculation,first the section power is adjusted towards the target power by adjusting generator output on both sides of the section,then the required UPFC capacity under this adjustment is calculated,after which the corresponding KUPFCis found.Thereafter,by comparing all calculation results,SUPFCat maximum KUPFCcan be obtained,which is the optimal result considering both economy and stability.

      (1) Northern-Central section

      It is found that the maximum section power can be increased by 1017 MW when a UPFC is installed in the Northern-Central section.Fig.5 shows the correlation between SUPFC and ΔPUPFC,where it can be seen that there is a saturation relationship between the two parameters.

      Fig.5 Relationship between UPFC capacity and section lifting power in the Northern-Central section

      The simulation results show that KUPFC is largest when SUPFC=138 MVA,and ΔPUPFC= 623 MW.Table2 presents a selection of data for detailed analysis.

      Table2 Calculation results of Northern-Central section

      calculation results (partial)SUPFCs<138 optimal SUPFCs>138 ΔPUPFC(MW) 74.9 225 473 623 771 870 1017 SUPFCs (MVA) 40 68 114 138 190 220 282 KUPFC 0.94 1.65 2.08 2.26 2.03 1.98 1.80

      It can be seen that the required UPFC capacity increases with the increase of ΔPUPFC.When SUPFCs<138 MVA,KUPFCincreases with SUPFCs,that is,the improving effect of unit capacity increases with the increase of UPFC capacity.For SUPFCs>138 MVA,KUPFC decreases with SUPFCs,as the UPFC capacity increases,its improving effect decreases.Therefore,in order to ensure the optimal control effect,SUPFCsshould be 138 MVA in the North-Central section.

      (2) Central-South section

      It is found that the maximum section power can be increased by 932 MW when a UPFC is installed in the Central-South section.Fig.6 shows the correlation between ΔPUPFC and SUPFCs,where it can be seen that there is a saturation relationship between the two parameters.

      Fig.6 Relationship between UPFC capacity and section lifting power in Central-South section

      The simulation results show that KUPFCis largest when SUPFCs=190 MVA,and ΔPUPFC=587 MW.Table3 presents selected data for detailed analysis.

      Table3 Calculation results of Central-South section

      calculation results (partial)SUPFCs<190 optimal SUPFCs>190 ΔPUPFC(MW) 181 32 478 587 626 725 932 SUPFCs (MVA) 88 126 172 190 213 253 330 KUPFC 1.03 1.31 1.39 1.55 1.47 1.43 1.41

      It can be seen that the required UPFC capacity increases with the increase of ΔPUPFC.When SUPFCs< 190 MVA,the improving effect of unit capacity increases with the increase of UPFC capacity.For SUPFCs>190 MVA,as the UPFC capacity increases,its improving effect deteriorates.Therefore,in order to ensure the optimal control effect,SUPFCsshould be 190 MVA in the Central-South section.

      (3) Western delivery section

      It is found that the maximum section power can be increased by 1044 MW when a UPFC is installed in the Western delivery section.Fig.7 shows the correlation between ΔPUPFC and SUPFCs.

      Fig.7 Relationship between UPFC capacity and section lifting power in Western delivery section

      The simulation results show that KUPFC is largest when SUPFCs=184 MVA,and ΔPUPFC=1044 MW.Table4 shows the detailed analysis of selected data.

      It can be seen that the required UPFC capacity increases with the increase of ΔPUPFCs.As the peak of KUPFC is at maximum section power,the curve does not show saturation characteristics.However,if the section power can be further improved,the unit lifting capacity of UPFC will decrease.

      Table4 Calculation results of Western delivery section

      calculation results (partial)SUPFCs<184 optimal ΔPUPFC(MW) 92.4 252 450 649 945 1044 SUPFCs (MVA) 20 47 81 115 167 184 KUPFC 2.31 2.68 2.78 2.82 2.83 2.84

      5.3 UPFC effect comparison and economic analysis

      Power flow calculations were carried out before and after UPFC installation.The comparison of the optimal result of each section is presented in Table5.

      Table5 Optimal result of individual sections

      Section SUPFCs(MVA)ΔPUPFC(MW) KUPFC Northern-Central section 276 623 2.26 Central-South section 380 578 1.52 Western delivery section 368 1044 2.84

      The priority of the above three application scenarios for projects is as follows: Western delivery section > Northern-Central section > Central-South section.

      The UPFC of the Western delivery section includes a 184 MVA series converter and a 184 MVA parallel converter.The project investment is approximately 450 million Yuan [34].The Western delivery section UPFC project can solve the problem of “stuck neck” in the section’s power flow transmission,and effectively improve the section transmission capacity by 1044 MW.This will lead to an improved safe operation level and avoid the costly and challenging construction of a 500 kV transmission channel.

      6 Conclusions

      This paper provides methods and recommendations for the site selection and application of UPFC devices in power grid planning.Following detailed evaluation,the following conclusions are reached:

      (1) Being a FACTS device that has accurate power flow control ability,the UPFC has the means to effectively improve transmission capacity.

      (2) The installation position and capacity of a UPFC have great influence on its control effect and economic benefit.In order to achieve the same control effect,a UPFC installed on heavy-load lines requires less capacity than one installed on light-load lines.The control effect of a UPFC is not proportional to its capacity.Before reaching the optimal value,the control effect increases with the increase of capacity.When a UPFC’s capacity reaches a certain point,the control effect of the unit capacity will decrease as the capacity increases.

      (3) The UPFC point selection method proposed in this article is practical,which has guiding significance for site selection and implementation of UPFC projects.

      While this study achieved it objective,it did not cover other application effects of UPFC.Therefore future research will include problems related to UPFC optimal configuration under other application scenarios or multiple optimization objectives.

      Acknowledgements

      This work was supported by State Grid Corporation’s Science and Technology Project “Research and Demonstration of Technical Measures for Improving Voltage Supporting Capacity of Large-scale Urban Power Grid” (52094016000Y).

      References

      1. [1]

        Gyugyi L,Schauder C D (1995) The unified power flow controller: a new approach to power transmission control.IEEE Transactions on Power Delivery 10(2):1085-1097 [百度学术]

      2. [2]

        Cheng HX,Nie YX (2013) Flexible AC transmission system.China Machine Press,Beijing [百度学术]

      3. [3]

        Chen H,Lu JM,Jiang L (2019) Engineering practice and application of UPFC.Hunan electric power 39(02):52-56 [百度学术]

      4. [4]

        Rajabi-Ghahnavieh A,Fotuhi-Firuzabad M,Othman M (2015) Optimal unified power flow controller application to enhance total transfer capability.Generation,Transmission & Distribution IET 9(4):358-368 [百度学术]

      5. [5]

        Shaheen H I,Rashed G I,Cheng S J (2007) Optimal Location and Parameters Setting of Unified Power Flow Controller Based on Evolutionary Optimization Techniques.Paper presented at IEEE Power Engineering Society General Meeting,2007 [百度学术]

      6. [6]

        Ongsakul W,Jirapong P (2005) Optimal allocation of FACTS devices to enhance total transfer capability using evolutionary programming.Paper presented at IEEE International Symposium on Circuits & Systems,2005 [百度学术]

      7. [7]

        Singh S N,David A K (2001) Optimal location of FACTS devices for congestion management.Electric Power Systems Research 58(2):71-79 [百度学术]

      8. [8]

        Qiu CL (2014) Research on power flow control strategy and site selection and capacity determination of unified power flow controller.Dissertation,Chongqing University [百度学术]

      9. [9]

        Sun RF (2004) Using sensitivity factor to optimize the distribution of UPFC points.Relay (22):4-6+45 [百度学术]

      10. [10]

        Song PC (2019) Research on control and optimization of power system with UPFC.Dissertation,Zhejiang University [百度学术]

      11. [11]

        Xie XR,Jiang QR (2001) Principle and application of flexible AC transmission system.Tsinghua University Press,Beijing [百度学术]

      12. [12]

        Qiang T (2009) Structural principle and application of a variety of new facts components.Neijiang technology (05):32-87 [百度学术]

      13. [13]

        Liangdong Z,Wenhui C (1998) Research on UPFC Model and Controller.Automation of Electric Power Systems (1):36-39 [百度学术]

      14. [14]

        Chen G (2004) Research on physical model of unified power flow controller.Dissertation,Wuhan University [百度学术]

      15. [15]

        Wang Y,Dong Y,Hou J et al (2017) Research on Power Flow Algorithm of Power System With UPFC Based on Modular Power Injection Model.Grid technology (08):142-147 [百度学术]

      16. [16]

        Wanchun Q,Lin Y,Pengcheng S,Zheng X (2016) UPFC System Control Strategy Research in Nanjing Western Power Grid.Grid technology 40(01):92-96 [百度学术]

      17. [17]

        Jun L,Zhigang Z,Huizhen K et al (2005) Technical research on improving transmission capacity of 500 kV power grid.Power grid technology 29(19):15-17 [百度学术]

      18. [18]

        Liu JK,Li Q,Chen J (2014) Power supply capacity improvement technology based on UPFC and its application in Jiangsu Power Grid.Electrical application 033(017):20-24+73 [百度学术]

      19. [19]

        Gao WM (2019) Research on optimal configuration and related control strategies of UPFC.Dissertation,North China Electric Power University [百度学术]

      20. [20]

        Xie C,Zhang Y,Huang YC (2013) Application of Reliability Cost-Benefit Analytical Method in Power Grid.Electric Power 46(5):106-110 [百度学术]

      21. [21]

        Ling F,Qin J,Dai Y et al (2015) Operation mode of Nanjing UPFC project.Jiangsu Electric Engineering V.34 No.164 (06):41-45 [百度学术]

      22. [22]

        Li PW (2002) A brief Introduction to Principle of UPFC Installed in Inez Substation of AEP System.Power System Technology 26(8):84-87 [百度学术]

      23. [23]

        Fardanesh B,Schuff A (2004) Dynamic studies of the NYS transmission system with the Marcy CSC in the UPFC and IPFC configurations.Paper presented at Transmission and Distribution Conference and Exposition,2004 [百度学术]

      24. [24]

        Kim S Y,Yoon J S,Chang B H et al (2005) The operation experience of KEPCO UPFC.Paper presented at Eighth International Conference on Electrical Machines and Systems,2005 [百度学术]

      25. [25]

        Li P,Lin JJ,Kong XP (2017) Application of UPFC in the 500kV Southern Power Grid of Suzhou.Electric Power Engineering Technology 36(01):20-24 [百度学术]

      26. [26]

        Yan W,Pan ZY,Shi ZX et al (2019) Design and application of UPFC in Shanghai 220 kV Power Grid.Power and energy (6):654-659 [百度学术]

      27. [27]

        Xiao SJ (2011) Application technology of power grid security and stability control.China Power Press,Beijing [百度学术]

      28. [28]

        Song PC,Xu Z,Deng F et al (2017) Critical factor analysis and optimization method for placement and sizing of unified power flow controller.Automation of Electric Power Systems 41(13):168-175 [百度学术]

      29. [29]

        Fu J,Zhu B,Tian J et al (2015) Research on the application of UPFC in Jinhua power grid.Zhejiang electric power (07):5-8 [百度学术]

      30. [30]

        Zhao L,Qiu C,Zheng L (2015) Study on capacity of UPFC based on artificial fish swarm algorithm.Mechanical and electrical engineering 032(005):717-721+738 [百度学术]

      31. [31]

        Li YY (2015) Research on location,capacity and control strategy of UPFC.Dissertation,Northeastern University [百度学术]

      32. [32]

        Luo H,Cheng L,Cao Y et al (2016) A configuration method of UPFC based on improving thermal stability margin and transmission capacity.Paper presented at annual meeting of China Society of electrical engineering,2016 [百度学术]

      33. [33]

        Sun V,Zhang J,Tian J et al (2014) Optimal selection of UPFC converter capacity.Paper presented at annual meeting of China Society of electrical engineering,2014 [百度学术]

      34. [34]

        Chen H,Lu J,Jiang L (2019) Engineering Practice and Application of UPFC in Hunan Power Grid.Hunan electric power 39(02):52-56 [百度学术]

      Fund Information

      supported by State Grid Corporation’s Science and Technology Project “Research and Demonstration of Technical Measures for Improving Voltage Supporting Capacity of Large-scale Urban Power Grid” (52094016000Y);

      supported by State Grid Corporation’s Science and Technology Project “Research and Demonstration of Technical Measures for Improving Voltage Supporting Capacity of Large-scale Urban Power Grid” (52094016000Y);

      Author

      • Xuhui Shen

        Xuhui Shen received doctor’s degree at China Electric Power Research Institute in 2012.He is currently working in China Electric Power Research Institute.His research interests and experiences are related to power system control,stability analysis and optimization etc.

      • Hongmei Luo

        Hongmei Luo received mastar’s degree at China Electric Power Research Institute in 2007.She is currently working in China Electric Power Research Institute.Her research interests and experiences are related to power system planning,stability analysis and optimization etc.

      • Wenman Gao

        Wenman Gao received master’s degree in electrical engineering from North China Electric Power University in 2019.She is currently working at China Electric Power Research Institute.The subject of her research is optimal configuration and control strategy of UPFC.

      • Yuyao Feng

        Yuyao Feng received master’s degree from Shanghai Jiaotong University,2008.He is currently working at State Grid Shanghai Electric Power Research Institute.His research interests and experiences are related to power system planning,stability analysis and optimization etc.

      • Nan Feng

        Nan Feng received master’s degree from North China Electric Power University,2014.She is currently working at State Grid Shanghai Electric Power Research Institute.Her research interests are power system simulation,stability analysis,and optimization.

      Publish Info

      Received:2019-01-08

      Accepted:2020-04-22

      Pubulished:2020-06-25

      Reference: Xuhui Shen,Hongmei Luo,Wenman Gao,et al.(2020) Evaluation of optimal UPFC allocation for improving transmission capacity.Global Energy Interconnection,3(3):217-226.

      (Editor Dawei Wang)
      Share to WeChat friends or circle of friends

      Use the WeChat “Scan” function to share this article with
      your WeChat friends or circle of friends