      Robust optimal dispatch strategy of integrated energy system considering CHP-P2G-CCS

      Bin Zhang1 ,Yihui Xia1 ,Xiaotao Peng2
      ( 1.School of Electrical Engineering,Naval University of Engineering,Wuhan 430000,P.R.China , 2.School of Electrical Engineering,Wuhan University,Wuhan 430072,P.R.China )

      Abstract

      Integrated energy systems (IESs) can improve energy efficiency and reduce carbon emissions,essential for achieving peak carbon emissions and carbon neutrality.This study investigated the characteristics of the CHP model considering P2G and carbon capture systems,and a two-stage robust optimization model of the electricity-heat-gascold integrated energy system was developed.First,a CHP model considering the P2G and carbon capture system was established,and the electric-thermal coupling characteristics and P2G capacity constraints of the model were derived,which proved that the model could weaken the electric-thermal coupling characteristics,increase the electric power regulation range,and reduce carbon emissions.Subsequently,a two-stage robust optimal scheduling model of an IES was constructed,in which the objective function in the day-ahead scheduling stage was to minimize the start-up and shutdown costs.The objective function in the real-time scheduling stage was to minimize the equipment operating costs,carbon emission costs,wind curtailment,and solar curtailment costs,considering multiple uncertainties.Finally,after the objective function is linearized with a ψ-piecewise method,the model is solved based on the C&CG algorithm.Simulation results show that the proposed model can effectively absorb renewable energy and reduce the total cost of the system.

      0 Introduction

      Reducing carbon emissions has become a global consensus with the increasingly severe energy crisis and global warming problems.China proposed the “dual carbon” target in September 2020 and promised to peak its carbon dioxide emissions by 2030 and achieve carbon neutrality by 2060[1-3].Energy substitution is essential for achieving the carbon peak and neutrality goals.In recent years,the installed capacity of wind and solar power in China has increased annually,effectively reducing the consumption of fossil fuels and carbon emissions.

      However,wind and solar power have intermittent and anti-peak regulation characteristics.With an increase in the installed capacity of wind power and solar power,power dispatching has became more complex,and curtailment of wind power and solar power has occurred in some areas.Recently,integrated energy systems have been widely studied for the flexible conversion of different energy sources through rational scheduling,which can improve the absorption rate of renewable energy [4-7].

      Reference [8] established a comprehensive demand response model that takes multiple microgrid systems as the leader and each load aggregator as the follower to form a master-slave interactive equilibrium model and then proved the existence and uniqueness of the game equilibrium solution. [9-11] focus on the multienergy-flow problem in the integrated energy system and the operational constraints of the energy-supply network were considered in the optimization problem.Reference [12]proposed an integrated energy-optimal dispatching strategy,including combined cooling,heating,and power (CCHP),and considered the security constraints of natural gas systems.In [13],a two-stage scheduling method combining multi-objective optimization and comprehensive decisionmaking was proposed for the economic emission scheduling problem of cogeneration.Reference [14] introduced the concept of integrated demand response.Reference [15]considers the security constraints of the integrated energy system and proposes a mixed integer programming method considering the N-1 uncertainty calculation of both the electricity and natural gas systems.

      The above studies have achieved remarkable results in the model establishment and optimization of integrated energy systems;however,these papers mainly focus on methods that reduce carbon emissions through energy substitution at the source,ignoring carbon capture.To overcome the above problems,[16] proposed a low-carbon economic dispatch model of the integrated electricityheat energy system considering the flexibility and lowcarbon nature of the carbon capture power plant,proving that the carbon capture power plant can significantly improve wind curtailment and low-carbon emissions,and the carbon cost introduced can improve the economy of the model.Reference [17] considered the synergy of powerto-gas (P2G) and carbon capture power plants in heat exchange and proved that P2G can effectively reduce the energy consumption of carbon capture power plants,and a carbon tax can achieve a balance between economy and low carbon.Reference [18] introduced oxygen-enriched combustion technology to the electricity-gas-heat integrated energy system and established a low-carbon economic dispatch model to balance the economy and low carbon.Based on the above research,[19] proposed a combined heat and power (CHP) model that considers P2G and a carbon capture system (CCS).The model captures CO2 emitted by the CHP and converts CO2 into natural gas through P2G,which not only improves the electric-thermal coupling characteristics of the CHP but also reduces carbon emissions and CO2 transportation costs.However,this study did not consider uncertainties in wind and solar power.

      Based on the above studies,a CHP considering the P2G and CCS (CHP-P2G-CCS) model is constructed in this study,and the electric-thermal coupling characteristics and P2G capacity constraints of the model are derived.A two-stage robust optimal scheduling model for an IES was established and solved using the C&CG algorithm.The following improvements were made in this study∶

      1.The derivation results of the electric-thermal coupling characteristics and the P2G capacity constraint of the model proposed in the paper are more accurate;

      2.The introduction of energy storage devices enriches the elements of the integrated energy system model;

      3.A two-stage robust optimal scheduling model of an integrated energy system is constructed,which enhances the robustness of the optimization results.

      1 Modeling and characteristic research of CHP-P2G-CCS

      To reduce carbon emissions and CO2 transportation costs,a CHP,P2G,and CCS system was developed.The model is shown in Fig.1.As illustrated in Fig.1,CHP generates electricity and heat by consuming natural gas;P2G obtains electricity and CO2 from CHP and the nearby carbon capture system (CCS),respectively,and converts CO2 into natural gas by consuming electricity,which can reduce carbon emissions and improve energy efficiency;CCS can capture the CO2 produced by CHP and transport the CO2 to P2G,which consumes electrical energy in the process.Because CCS is located beside P2G,long-distance transmission and storage of CO2 is avoided,reducing CO2 transportation and storage costs.

      Fig.1 Schematic diagram of CHP-P2G-CCS model

      The electric energy produced by CHP is mainly used in three ways∶ consumed by users after being connected to the grid,provided for P2G to produce natural gas,and used by the CCS to capture CO2,which can be expressed as

      where t is the time,Pc is the electric energy generated by the CHP,Pc1 is the output of electric energy,Pc2 is the energy consumed by P2G,Pc3 is the energy consumed by the CCS.CCS captures CO2 by consuming electrical energy,and the amount of CO2 captured can be considered approximately proportional to Pc3,which is expressed by [20]

      where CCCS is the amount of CO2 captured by CCS and α is the capture efficiency.

      The CO2 captured by the CCS is transported to the P2G system to produce natural gas.The amount of natural gas produced by the P2G system and the electrical energy consumed in the production process are approximately proportional to the amount of CO2,which can be expressed as [21]

      where β and χ are the proportional coefficients.

      From (2) and (4),(1) can be rewritten as

      During CHP operation,the power generation and heat production should meet certain constraints,which are called the electric-thermal coupling characteristics of the CHP,as shown by the blue line in Fig.2.As shown in Fig.2,the electric-thermal coupling characteristic of the CHP is expressed as[22]

      Fig.2 Electric-thermal coupling characteristics of CHP and CHP-P2G-CCS

      where Pc,max and Pc,min are the maximum and minimum values of CHP power generation,respectively; is the value of CHP heat generation; is the heat generation value corresponding to Pc,min; is the maximum CHP heat generation;cv1,cv2,and cm are the electric-thermal conversion coefficients of the CHP.

      Substituting (5) into (6),which is expressed as (7) ∶

      The power consumption of the P2G converter satisfies the capacity constraint,which is limited to∶

      where Pc2,max and Pc2,min are the maximum and minimum values of P2G power consumption,respectively.

      Substituting (8) into (7),the electric-thermal coupling characteristic of CHP-P2G-CCS is expressed as (9)∶

      The electric-thermal coupling characteristics of the model can be drawn from (9),as indicated by the red line in Fig.2∶ The operating range for the CHP electrical and thermal power was ABCD,whereas that for the CHPP2G-CCS was EFGHI.Compared (9) with (6),it is clear that GHI is obtained by downward of BCD,of which the downward amplitude is (1+αχ)Pc2,max,and EF is obtained by downward of AB,and the downward amplitude is (1+αχ)Pc2,min.Since (1+αχ)Pc2,min<(1+αχ)Pc2,max,the area of EFGHI is bigger than that of ABCD,which means the adjustment range of electrical power becomes larger,and the electricthermal coupling characteristics are weakened.

      The constraint conditions for P2G natural gas production can be obtained from (3),(4),and (8),which is expressed as follows∶

      where are the maximum and minimum P2G natural gas production values,respectively.

      It can be seen from (9) and (10) that when the CHPP2G-CCS operates on the operation boundary GHI,Pc2 takes the maximum value,;When the CHP-P2G-CCS runs on the running boundary EF,Pc2 takes the minimum value,.Therefore,natural gas production is constrained by P2G power consumption and CHP electrical power,whereas electrical power is constrained by thermal power.

      The constraint relationship between electric power,thermal power,and natural gas output can be obtained by combining (3),(4),(5),and (6),which is expressed as (11)∶

      The corresponding relationships among the electric power,thermal power,and natural gas output can be obtained from (11),and the relationships among the three are shown in Fig.3.

      Fig.3 Operation characteristic curve of CHP-P2G-CCS

      This shows that the feasible region of electric power,thermal power,and natural gas output is EFGHI–JKLMN and that there is a coupling relationship between the three.

      The net CO2 emission of the CHP-P2G-CCS can be defined as the difference between the CO2 emissions of the CHP and the CO2 capture of the CCS,which can be expressed as

      where CCHP is the CO2 emission of the CHP,aCO2,bCO2,cCO2 are the emission factors of the CHP.

      It can be seen from (12) and (13) that the net CO2 emission of CHP-P2G-CCS is related to the electric power and thermal power,and there is a coupling relationship between the three.It can be seen from the formula (11) that if and only if Pc1 (t)=Pc,max -cv2Phc(t),CC-P-C(t)=CCHP(t);When Pc1(t) ≠ Pc,max-cv2Phc (t),CC-P-C(t) < CCHP(t).Therefore,the CHP-P2G-CCS can reduce CO2 emissions.

      2 Two-stage robust optimal scheduling model

      The structure of the integrated energy system is shown in Fig.4.The integrated energy system comprises four energy networks∶ electricity,heat,gas,and cold energy.Wind power,photovoltaics,CHP-P2G-CCS,natural gas sources (NS),micro-gas turbines (MT),electric refrigerators(ER),and gas refrigerators (GR) are essential components of integrated energy systems.To improve the efficiency of energy utilization and reduce the operating cost of the system,a two-stage robust optimal scheduling model for an IES was constructed in this study.

      Fig.4 The structure of the integrated energy system

      2.1 Objective function

      In the day-ahead dispatching stage,the minimum startup/shut-down cost is considered an objective function to determine the start-up/shut-down state of the controllable equipment.In the real-time dispatching stage,the output of the controllable equipment is adjusted according to the actual output of wind and solar power,considering multiple uncertainties based on the result of the day-ahead dispatching.The minimum equipment operation cost,carbon emission cost,wind curtailment cost,and solar curtailment cost are taken as objective functions,as shown in (14)– (16).

      where f1 and f2 are the objective functions in the day-ahead dispatching and real-time dispatching stages;Ii is the onoff state of the i th controllable equipment;Cs,i is the startup cost of the i th controllable equipment;Cop and CCO2 are respectively the equipment operation cost and carbon emission cost;T is the scheduling time period;cw and cs are respectively wind power curtailment cost and solar power curtailment cost;ΔPw and ΔPs are the wind power curtailment and solar power curtailment respectively.

      The equipment operation cost includes the operation cost of the CHP-P2G-CCS,NS,MT,ER,GR,and energy storage(ES) equipment,which is expressed as

      where I is the collection of CHP-P2G-CCS,NS,MT,ER,GR,and ES;a1,i is the unit operation cost of equipment i;Pi is the input power of equipment i.

      The cost of carbon emissions is determined by carbon emissions and carbon emission quotas,which can be expressed as

      where a2 i s the unit cost of carbon emissions,Pmt is the power generation of the micro gas turbine,dCO2 is the CO2 emission coefficient of the micro gas turbine,and q is the carbon emission quota per unit of power generated.

      2.2 Constraints

      (1) Power balance constraints

      where Pdis and Pch are the discharge and charge capacity of the energy storage device,respectively;Pe-c is the power consumption of ER;is the heat production of MT;and are the discharge and charge capacity of the heat storage device respectively;is the heat load;is the gas supply of the NS;and are the gas consumption of P2G,MT and GR respectively; is the gas load;and do the MT,ER and GR generate the cold power respectively; and are the cooling power discharged and charged by the cold storage device respectively;is the cold load.

      (2) Equipment capacity and ramp constraint

      The capacity and ramp constraints are satisfied for energy generation equipment,such as CHP,MT,and GR,which are expressed as [23-25]

      where Pi is the input power of the i th capacity equipment;Pi,min and Pi,max are the lower and upper limits of the input power,respectively;Ri,down and Ri,up are the landslide and climbing constraints,respectively;Si,on and Si,off are the durations of the startup and shutdown states,respectively;Ti,on,min and Ti,off,min are the minimum startup and shutdown times,respectively.

      (3) Energy coupling constraints

      The energy coupling equipment can realize the mutual conversion of electricity,heat,gas,and cold.The energy conversion process satisfies certain constraints,which can be expressed as

      where j represents the collection of energy forms,including electricity,heat,gas and cold;Pi,j represents the magnitude of the input power converted into the j th energy form by the i th energy coupling device;ηi,j is the conversion efficiency.

      (4) Energy storage device constraints

      Energy storage equipment includes Electrical Storage(ES),Hot Storage (HS),and Cold Storage (CS),which satisfy charge-discharge constraints,capacity constraints,and initial–final power deviation constraints,which can be expressed as [26-28]

      where∶ s[ES,HS,CS];Ps,ch and Ps,dis respectively represent charging and discharging power;Is,ch and Is,dis respectively represent charging and discharging States,which are 0-1 variables;Ps,ch,min and Ps,ch,max respectively represent the lower and upper limits of energy charge;Ps,dis,min and Ps,dis,max respectively represent the lower and upper limits of energy discharge;Es is the energy storage capacity;δs,ηs,ch and ηs,dis are the self-loss rate and charge/discharge efficiency of energy storage respectively;Es,min and Es,max are the lower limit and upper limit of energy storage capacity respectively;Es,a,max is the maximum deviation allowed by the energy storage device in a scheduling period.

      3 Model solution

      3.1 Linearization of the objective function

      The carbon emission cost in the objective function is a quadratic function that is transformed into a linear function to simplify the model.Let the general expression of the quadratic function be

      where a,b,c are the coefficients of the quadratic function.

      Using the ψ-piecewise equation mentioned in reference[29],the expression of the function f in the subinterval[xmin+nΔx,xmin+(n+1) Δx] is obtained as follows∶

      where ψ is the number of subintervals for linearization of quadratic function,and the larger ψ is,the higher the accuracy of function fitting is.For ψ =5,the maximum error of the fitting function is less than 1%.

      3.2 Construction of Uncertainty

      Wind power,solar power,and load all have uncertainties;however,the uncertainty of the load is weak,and the accuracy of the prediction is high,which will not cause significant errors in the calculation results.Therefore,load uncertainty was not considered in this study.The uncertainty sets of wind and solar power can be expressed as [30,31]

      where Pi,a and Pi,rare the actual and predicted values;Pi,u and Pi,lare the upper and lower bounds of the uncertainty set,respectively;ΓL is the adjustable parameter of the uncertainty.

      3.3 Model solving method based on the C &CG algorithm

      The robust optimal dispatch model of the integrated energy system constructed in this study can be organized into a matrix form,which is expressed as

      where x represents the start-up and shut-down states of the controllable unit,which is a 0-1 variable;y represents the output of the controllable equipment;w represents the uncertainty of wind power and solar power;a and b are coefficient matrices in the objective function;D and E are coefficient matrices of equality constraints;e is a constant column vector of equality constraints;A,B,C and F are coefficient matrices of inequality constraints;c,d,and f are constant column vectors with inequality constraints.

      To improve the solution efficiency,this study uses the C&CG algorithm proposed in [32] to divide the two-stage robust optimal scheduling model into a master problem and a sub-problem.The main problem can be expressed as

      where θ is the auxiliary variable,which is used to replace the sub-problem target;k is the number of iterations;yl is the recourse variable added to the main problem at the i th iteration;wl is the uncertainty parameter,which is obtained by calculating the sub-problem.

      The main problem was a linear mixed-integer programming problem that could be solved directly using MATLAB and other software packages.

      The sub-problem is expressed as∶

      where x* is the solution of the main problem as a given parameter of the sub-problem.

      The sub-problem is a bi-level problem whose inner layer is linear and can be transformed by KKT conditions or the strong duality law.In this study,the KKT conditions were used to transform the bi-level sub-problem into a singlelevel equivalent sub-problem,which can be expressed as

      where α,β,δ are the dual operators of (55)-(57) respectively;m,n,q are the indices of constraints and parameters.

      (60) and (62) contain the product of the dual operator and parameter y,which is a nonlinear function that can be linearized using the big-M method.Taking (61) as an example,it can be transformed into

      where M is an immense constant,and ξ is an auxiliary variable.

      (64)-(66) show that when ξn=0,δn=0 and Fyf,when ξn=1,δn ≤ 0 and Fy= f.Therefore,(64)-(66) are equivalent to (61).

      After the above changes,the sub-problem is transformed into a linear mixed-integer programming problem that can be solved directly using MATLAB and other software.The proposed optimal dispatch framework for the integrated energy system is shown in Fig.5.

      Fig.5 The flow chart of the proposed model-solving method

      4 Example analysis

      4.1 Example parameters

      The structure used in the example is shown in Fig.4,and the relevant parameters are listed in Table 1.In Table 1,G2P represents the conversion of natural gas into electrical energy,G2H represents the conversion of natural gas into heat energy,G2C represents the transformation of natural gas into cold energy,and P2C represents the transformation of electric energy into cold energy.

      Table 1 The parameters of the models

      The predicted curves of the wind power,solar power,electric load,heat load,gas load,and cold load are shown in Fig.6.

      Fig.6 Prediction Curve of wind power,solar power,and load

      4.2 Result analysis

      (1) Analysis of model validity and the influence of robust parameters on optimization results.

      Three optimization models were compared to verify the validity of the model.

      Model 1∶ CHP without P2G,CCS.

      Model 2∶ CHP systems with P2G and CCS are located in different places and have no coupling relationships.

      Model 3∶ CHP with P2G and CCS forms a whole system located at the exact location (model proposed in this paper).

      By changing the upper and lower uncertainty limits and adjustable parameters of the model,the result of renewable energy consumption power and operation cost of different models can be obtained,as shown in Fig.7,where the“Robustness” in Fig.7 (a) and Fig.7 (b) represents the ratio of the upper and lower uncertainty limits to the predicted value,and the upper limit and the lower limit are equal.

      Fig.7 Effect of changing the robust parameters on the operation result

      The uncertainty constraints corresponding to the worst-case scenario worsen with increased robustness and adjustable parameters.The integrated energy system is expected to consume more wind power and photovoltaic power,and the unit capacity of some energy-coupling equipment will increase,leading to an increase in operating costs;the corresponding expected consumption of wind power and solar power will also increase.Therefore,as shown in Fig.7,when the robustness and adjustability parameters are increased,the renewable energy consumption power and operating cost of the three optimization models are increased.

      Because model 1 has no P2G or CCS,compared with models 2 and 3,the cost of model 1 is higher,and renewable energy consumption is smaller.Compared with Model 2,the cost of Model 3 is lower,and the consumption of renewable energy is higher because Models 2 and 3 have the same components in the system;the difference is that CHP,P2G,and CCS in Model 2 are located in different places and have no coupling relationship,but in Model 3,they form a whole system and are located in the same place,which proves that the CHP-P2G-CCS model proposed–this model can not only reduce the operation cost of the integrated energy system but also improve the regulation range of electric power and increase the absorption capacity of renewable energy,as proposed in Section 2.It was verified that Model 3 has more advantages than Model 2.

      (2) Operation results

      The adjustable and robust parameters were set to 8 and 20%,respectively.The electric load balance of the integrated energy system is shown in Fig.8 (a),where Pshortage is the difference between the electric load and the sum of wind power and solar power.From 1 to 6 o’clock,the sum of wind and solar power exceeds the electrical load,and the system must absorb too much renewable energy.To solve this problem,the first step is to reduce the output of other power supply equipment.It can be found that,except for a small output of MT at 6 o’clock,the output of power supply equipment at other times is 0.The second is to increase the charging power of the energy storage device and electrical equipment.From 1 to 6 o’clock,the energy storage equipment is charging,and the electrical refrigeration equipment is working at full load.The third is the curtailment of wind and solar power.When these two methods cannot fully absorb renewable energy,there is a small amount of wind and solar power curtailment at 2 and 4–6 o’clock.From 7 to 24 o’clock,the electric load was greater than the sum of wind and solar power.To solve the problem of power supply and demand balance,the first step is to increase the output of the power supply equipment.The CHP and MT are in a full power state most of the time;the second is to improve the discharge power of the energy storage device,which is in a discharge state in a plurality of time periods;the third is to reduce the output of the power consumption equipment,and the electric refrigeration equipment only has an output in a short time.

      Fig.8 Load Balance Diagram of Integrated Energy System

      Through calculation,it is found that the integrated energy system consumes 2 640.614 MW of renewable energy,and the total power of wind and solar curtailment is 19.4 MW,accounting for only 0.73%,indicating that the model in this paper can effectively consume renewable energy.Meanwhile,when the electric load exceeds the sum of the wind power and solar output,the integrated energy system meets the load demand of 565 MW through the energy coupling equipment,accounting for 18.46% of the total load,which can help the system achieve real-time load balancing.

      A balance diagram of the heat,gas,and cold loads of the integrated energy system is shown in Fig.8(b)–(d).It can be seen that the model in this study can realize a realtime balance of the heat load,gas load,and cold load by adjusting the output of each energy coupling equipment and the charge/discharge power of the energy storage devices;the output of each unit and the charge/discharge power of the energy storage devices are within the constraints.

      5 Conclusions

      In this paper,the CHP-P2G-CCS model is constructed,and compared with the traditional CHP model,it is proved that the model can improve the electric-thermal coupling characteristics and enhance the regulation range of electric power.A two-stage robust optimization model was established and solved based on the C&CG algorithm.The following conclusions are drawn based on the simulation results∶

      (1) As the robustness of the model increases,both the renewable energy consumption and operation cost of the integrated energy system will increase,and a trade-off needs to be made between the two.

      (2) Compared to the traditional CHP model,the CHPP2G-CCS model in this study can absorb more renewable energy and has a lower operating cost.

      (3) The CHP-P2G-CCS model constructed in this study could effectively absorb renewable energy and satisfy the load demands of users.

      Acknowledgments

      This study was supported by the National Natural Science Foundation of China (Grant number 51977154).

      Declaration of Competing Interest

      We declare that we have no conflict of interest.

      References

      1. [1]

        Li H,Liu D,Yao DY (2022) Analysis and reflection on the development of power system towards the goal of carbon emission peak and carbon neutrality.Proceedings of the CSEE,41(18)∶ 6245-6258 [百度学术]

      2. [2]

        Huang YH,Ding T,Li YT,et al.(2022) Decarbonization technologies and inspirations for the development of novel power systems in the context of carbon neutrality.Proceedings of the CSEE,41(S1)∶ 28-51 [百度学术]

      3. [3]

        Zhang ZG,Kang CQ (2022) Challenges and prospects for constructing the new-type power system towards a carbon neutrality future.Proceedings of the CSEE,42(8)∶ 2806-2818 [百度学术]

      4. [4]

        Gu W,Wu C,Wang J,et al.(2017) Optimal operation for integrated energy system considering thermal inertia of district heating network and buildings.Applied Energy,199(4)∶ 234-246 [百度学术]

      5. [5]

        Wang WJ,Wang D,Jia HJ,et al.(2016) Review of steady-state analysis of typical regional integrated energy system under the background of energy internet.Proceedings of the CSEE,36(12)∶3292-3305 [百度学术]

      6. [6]

        Jia HJ,Mu YF,Yu XD (2015) Thought about the integrated energy system in China.Electric Power Construction,36(1)∶ 16-25 [百度学术]

      7. [7]

        Ren HB,Gao WJ (2010) A MILP model for integrated plan and evaluation of distributed energy systems.Applied Energy,87(3)∶1001-1014 [百度学术]

      8. [8]

        LI P,Wu DF,Li YW,et al.(2021) Optimal dispatch of multimicrogrids integrated energy system based on integrated demand response and stackelberg game.Proceedings of the CSEE,41(4)∶1307-1321 [百度学术]

      9. [9]

        Wang JY,Hu ZJ,Xie SW (2019) Expansion planning model of multi-energy system with the integration of active distribution network.Applied Energy,253(2019)∶ 1-22 [百度学术]

      10. [10]

        Xie SW,Hu ZJ,Wang JY,et al.(2020) The optimal planning of smart multi-energy systems incorporating transportation,natural gas and active distribution networks.Applied Energy,269(2020)∶1-20 [百度学术]

      11. [11]

        Wang YL,Wang YD,Huang YJ,et al.(2019) Operation optimization of regional integrated energy system based on the modeling of electricity-thermal-natural gas network.Applied Energy,251(2019)∶ 1-27 [百度学术]

      12. [12]

        Li GQ,Zhang RF,Tao J,et al.(2022) Optimal dispatch strategy for integrated energy systems with CCHP and wind power.Applied Energy,192(139)∶ 408-419 [百度学术]

      13. [13]

        Li Y,Wang JL,Zhao DB,et al.(2018) A two-stage approach for combined heat and power economic emission dispatch∶combining multi-objective optimization with integrated decision making.Energy,162(200)∶ 237-254 [百度学术]

      14. [14]

        S Bahrami,A Sheikhi (2016) From demand response in smart grid toward integrated demand response in smart energy hub.IEEE Transactions on Smart Grid,7(2)∶ 650-658 [百度学术]

      15. [15]

        Zhang Y,Hu Y,Ma J,et al.(2018) A mixed-integer linear programming approach to security-constrained co-optimization expansion planning of natural gas and electricity transmission systems.IEEE Transactions on Power Systems,33(6)∶ 6368-6378 [百度学术]

      16. [16]

        Lu ZG,Yang Y,Geng LJ,et al.(2018) Low-carbon economic dispatch of the integrated electrical and heating systems based on benders decomposition.Proceedings of the CSEE,38(7)∶ 1922-1934 [百度学术]

      17. [17]

        He LC,Lu ZG,Zhang JF,et al.(2018) Low-carbon economic dispatch for electricity and natural gas systems considering carbon capture systems and power-to-gas.Applied Energy,224(119)∶ 357-370 [百度学术]

      18. [18]

        Cui Y,Zeng P,Zhong WZ,et al.(2021) Low-carbon economic dispatch of electro-gas-thermal integrated energy system based on oxy-combustion technology.Proceedings of the CSEE,41(2)∶592-607 [百度学术]

      19. [19]

        Ma YM,Wang HX,et al.(2021) Modeling and optimization of combined heat and power with power to gas and carbon capture system in integrated energy system.Energy,236(121392)∶ 1-12 [百度学术]

      20. [20]

        Chen Z,Zhang Y,Ji T,et al.(2018) Coordinated optimal dispatch and market equilibrium of integrated electric power and natural gas networks with P2G embedded.Modern Power System and Clean Energy,6(3)∶ 495-508 [百度学术]

      21. [21]

        He L,Lu Z,Zhang J,et al.(2018) Low-carbon economic dispatch for electricity and natural gas systems considering carbon capture systems and power-to-gas.Apply Energy,224(2018)∶ 357-370 [百度学术]

      22. [22]

        Dong S,Qi T,Bo W,et al.(2020) District energy system modeling and optimal operation considering CHP units dynamic response to wind power ramp events.Sustain Cities and Society,63(2020)∶ 1-11 [百度学术]

      23. [23]

        Gao HS,Zhang YM,Ji XG,et al.(2020) Scenario clustering based distributionally robust comprehensive optimization of active distribution network.Automation of Electric Power Systems,44(21)∶ 32-41 [百度学术]

      24. [24]

        Wang C,Wang S,Bi TS (2020) Wind power accommodation capability assessment of integrated energy systems with gas-fired units.Proceedings of the CSEE,40(7)∶ 2192-2201 [百度学术]

      25. [25]

        Tang XY,Hu Y,Geng Q,et al.(2021) Multi-time-scale optimal scheduling of integrated energy system considering multi-energy flexibility.Automation of Electric Power Systems,45(4)∶ 81-90 [百度学术]

      26. [26]

        Wang JY,Hu ZJ,Xie SW (2020) Smart multi-energy system planning considering the traffic scheduling.Proceedings of the CSEE,40(23)∶ 7539-7554 [百度学术]

      27. [27]

        Cui QS,Bai XM,Dong WJ (2019) Joint optimization of planning and operation in user-side multi-energy systems.Proceedings of the CSEE,39(17)∶ 4967-4981 [百度学术]

      28. [28]

        Yuan ZP,Xia J,Li P (2021) Two-time-scale energy management for microgrids with data-based day-ahead distributionally robust chance-constrained scheduling.IEEE on Smart Grid,12(6)∶ 4778-4787 [百度学术]

      29. [29]

        Li G,Zhang R,Jiang T,et al.(2017) Optimal dispatch strategy for integrated energy systems with CCHP and wind power.Applied Energy,192(139)∶ 408-419 [百度学术]

      30. [30]

        Zhang YC,Yi Y,Hu ZP.(2021) Resilience enhancement strategy of electricity-gas integrated energy system based on distributionally robust optimization.Automation of Electric Power Systems,45(13)∶ 76-84 [百度学术]

      31. [31]

        Zhang XH,Liu XY,Zhong JQ (2020) Integrated energy system planning considering a reward and punishment ladder-type carbon trading and electric-thermal transfer load uncertainty.Proceedings of the CSEE,40(19)∶ 6132-6141 [百度学术]

      32. [32]

        Zeng B,Zhao L (2013) Solving two-stage robust optimization problems using a column-and-constraint generation method.Operations Research Letters,41(3)∶ 457-461 [百度学术]

      Fund Information

      Author

      • Bin Zhang

        Bin Zhang received a bachelor’s degree and a master’s degree at Wuhan University in 2014 and 2017.He is working at the Naval University of Engineering,Wuhan.His research interests include power system operations.

      • Yihui Xia

        Yihui Xia received a bachelor’s degree,master’s degree,and Ph.D.degree at the Naval University of Engineering,Wuhan,in 2009,2011 and 2015.He is working at the Naval University of Engineering,Wuhan.His research interests include power electric machine design and control.

      • Xiaotao Peng

        Xiaotao Peng received a bachelor’s degree,master’s degree,and Ph.D.degree at Huazhong University of Science and Technology,Wuhan,in 1993,2002,and 2006.He is working in Wuhan University,Wuhan.His research interests include power system operations.

      Publish Info

      Received:

      Accepted:

      Pubulished:2024-03-04

      Reference: Bin Zhang,Yihui Xia,Xiaotao Peng,(2024) Robust optimal dispatch strategy of integrated energy system considering CHP-P2G-CCS.Global Energy Interconnection,7(1):14-24.

      (Editor Yanbo Wang)
      Share to WeChat friends or circle of friends

      Use the WeChat “Scan” function to share this article with
      your WeChat friends or circle of friends